Building a 45 Litre Igloo Mash Tun

Each piece of the soldered manifold is made from 22mm copper pipe with un-soldered joints to allow disassembly and cleaning with a ‘cask tap cleaning brush’, the underside 1/3-1/2 of the copper tube is slotted with a 1mm Angle grinder disk.
The hole in the coolbox was made with a 21mm Q-max cutter, the tank connector was drilled out with a 15mm Blacksmiths drill (this would have been a lot easier with a Pillar drill and a Vice, but all I have is a crappy woodworking vice clamped to a wobbly table and a Cordless drill!)

Tools used were:
Pipe cutter
Solder, Flux, and Blow lamp
Round file
Flat file
Angle Grinder with 1mm Cutting disks
Scotch Brite pad
21mm Q-max cutter, with 8mm pilot drill
15mm Blacksmith’s drill
Cordless Drill / driver

Parts used were:
45litre Igloo coolbox
22mm Copper pipe
15mm copper pipe
6-off 22mm Equal Elbows
4-off 22mm Equal Tees
1-off 15x22x22mm Un-equal Tee
15mm Brass compression tank connector
15mm Brass Ball Valve

The Igloo coolbox which came from an ebay seller:
Image
Some of the manifold pieces cut and arranged:
Image
Soldered and separated:
Image
Soldered and attached:
Image
15mm Ball Valve tap fitted approx 11mm up from the inside base of the coolbox:
Image
Cleaned manifold:
Image

I found while fitting everything together that the Elbows were a bit more acute than 90 degrees which made it look all out of parallel, I fixed this by soldering it up with the removable end pieces on.
Everything was filled clean of burrs inside and out, excess solder removed, then scotch-brite pad used to polish up the copper. A thorough clean with a mild soda crystal solution gave it a final internal clean out. I later added a short bent turn-down spout from the ball valve with a 8mm reducer soldered to it.

Building a dual purpose Copper / Hot Liquor Tank from a 50 Litre Stainless Steel stock pot and two Backer kettle elements. The Stock Pot. The Elements.

The Tools and the Holes, 3mm Cobalt drill, allen key, 21mm Q-max cutter, adjustable spanner, 10mm HSS drill:
Image
15mm Polycarbonate tube in the Brass push-fit (Bent Tap Connector), Copper pipe goes right through the drilled out Tank connector to connect the 15mm Ball valve & Hop Stopper:
Image
White Plastic clip, drilled and tapped M10, Stainless Nuts, Washers, Threaded Rod:
Image
Inside the vessel, sight tube on the left, and copper stub for connecting Hop Stopper, I’ll most likely swap the washers for some silicone baking sheet ones:
Image
Sight Glass fitted with Tank connector and Brass Push-fit:
Image

Ball Valve tap fitted:
Image
Syphon effect extension with 8mm restriction at bottom:
Image
Hop Strainer soldered and fitted, just needs a shed load of holes drilling in the bottom third of the 22mm pipe, made almost exactly the same as my own so you can tilt the boiler a little when its time to run off and you get a little bit more wort for your hard work. The End Cap just pulls off for cleaning and the Brass Compression elbow allows you to get a Cask Tap cleaning brush right inside to clean too:
Image

Left to right – Element, 37.5mm Q-max cutter, pierced slug, Carbide Burr, Psudo-Dremel, Spanner & Allen key (My Q-max cutter is for cheap-ass kettle elements so i had to whizz round it with the Dremel to open the holes up and make a snug fit for the M40 threads on the element):
Image
Fitted element:
Image
Both elements fitted, I decided to fit them at 90 degrees:
Image

After fitting I wired up the plugs on the Element leads, and filled the vessel full of water to check for leaks. No leaks found so I emptied out and did a boil test with both elements which was good for cleaning the pipework out, I gave the element sockets a wiggle and one almost popped off.
So I’ve decided to get the KM8 bearing nuts to secure them instead, I’ve also sanded down the original plastic cowls which helps but one of them still feels a bit dodgy so I’d prefer it not to fail when having 45-50 Litres of boiling wort in it… so Bearing Nuts it will be!
Once its all secure I will do another boil test and give the copper pipework another good flush through.

Last piece of the puzzle… all that is needed is a good boiling to clean out the copper pipework and also clean off the IC I’m making.
Image
Image
www.bearingboys.co.uk/KM8_Bearing_Locking_Nut


Vital Stats

  • 218,793 hits

Books worth a read

Suggested Sites

Historical Data

Podcast & Feeds

QR Code

qrcode

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 1,558 other subscribers